Bartow/Paulding County, Georgia

Piedmont Geotechnical Consultants (PGC) has provided construction materials testing services during the installation of 3.5 miles of 48-inch raw water line from the Etowah River Pump Station to the Richland Creek Reservoir and 11 miles of 36-inch finish water line from the water treatment plant south along US Highway 61 to connect with the existing county water distribution system.  PGC performed testing of soil, aggregate and asphalt testing for sections of pipeline, and at selected road and driveway crossings.

CLIENT / OWNER:  ARCADIS
DURATION: 2017-PRESENT
CONSTRUCTION COST: $31 Million