RICHLAND CREEK DAM

CONTACT US

Piedmont Geotechnical Consultants

HEADQUARTERS
3000 Northfield Place Suite 1100
Roswell, GA 30076

Paulding County, Georgia

Piedmont Geotechnical Consultants (PGC) performed the geotechnical field explorations, engineering evaluations and preparation of engineering reports addressing the geotechnical aspects for the design and construction of this +/- 125-ft tall, 2,800-ft long earthen embankment dam as part of the Richland Creek Water Supply Project. Due to the challenging geologic setting surrounding the dam and reservoir site, the geotechnical embankment design included a 2,100-ft long two-line grout curtain, a 1,260-ft long partial cutoff wall and a considerable seepage collection system.

During construction, PGC is providing project oversight, geotechnical engineering evaluation, and earthwork and construction materials quality control in accordance with the Georgia Safe Dams Program rules.

CLIENT / OWNER: ARCADIS-US/PAULDING COUNTY BOARD OF COMMISSIONERS
DURATION: 2012-Ongoing
DAM CONSTRUCTION COST: APPROXIMATELY $50 MILLION
AERIAL PHOTO COURTESY OF BRAD COLE CONSTRUCTION